커스터마이징: | 사용 가능 |
---|---|
판매 후 서비스: | 제공합니다 |
보증: | 제공합니다 |
배송 비용: | 운임과 예상 배송 시간에 대해서는 공급업체에 문의하세요. |
---|
결제 수단: |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() |
---|---|
USD로 결제 지원 |
안전한 결제: | Made-in-China.com에서 결제하는 모든 내용은 플랫폼에 의해 보호됩니다. |
---|
환불 정책: | 주문한 상품이 배송되지 않거나, 누락되었거나, 상품에 문제가 있는 경우 환불을 청구하세요. |
---|
비즈니스 라이센스가 검증 된 공급 업체
독립적인 제3자 검사 기관의 감사를 받음
Applications
This series heavy pipe crusher does not require shredding for medium-diameter pipes, and can be directly crushed and recycled in one step.
The specially designed pipe feeding hopper of this series of models enters the pipe and forms a specific angle with the crusher rotor to achieve the best crushing effect. The crushing length of pipes and profiles can reach 6 meters.
Descriptions
It also has large rotor bearings, tool racks and rotors. The standard Vshaped cutting technology is conducive to improve the cutting recovery efficiency andreduce the dust content in the recycled material.
For materials with higher strength and larger volume, the impact force can be reduced, and at the same time.It also avoids the possibility of the spindle moving tool being blocked by the material.Special steel and strong welding technology ensure product quality.
Power is in the range of 22-160KW,the output is between 450-1200kg/h.
Specifications
Model | Feed Mouth Size (mm) |
Main Motor Power (KW) |
Moving Knife Quantity (PIS) |
Fixed Knife Quantity (PIS) |
Rotor Diameter (MM) |
Output (KG/H) |
DYPS-G 700 | 310*300 | 22-37 | 6/10 | 4 | Ф500 | 450 |
DYPS-G 800 | 360*350 | 45-75 | 6/10 | 6 | Ф600 | 650 |
DYPS-G 1000 | 510*500 | 75-110 | 10/14 | 6 | Ф700 | 850 |
DYPS-G 1200 | 650*650 | 110-160 | 14/18 | 6 | Ф800 | 1200 |
Jwell was founded in 1997, China Plastics Machinery Industry Association vice president unit, plastic extrusion equipment, chemical fiber spinning complete sets of equipment manufacturers. The production bases of Jwell company cover about 7,000,000 square meters and are consisted with 7 parts, which are located in Jiading district of Shanghai where the head office of the company locates, Haining and Zhoushan City of Zhejiang Province, Taicang City and Liyang City of Jiangsu Province, Foshan City of Guangdong Province and Thailand. The company has 26 professional companies and nine large-scale gold processing plants and three heat treatment nitriding plants, with an annual output of 3000+ sets of high-grade plastic extrusion production lines and other complete sets of equipment, marketing in more than 120 countries and regions.
Jwell has a high-quality team and an experienced team of mechanical and Electrical Commissioning Engineers, as well as an advanced machining base and Standard Assembly Workshop.
Workshop Processing
Quality Control
Global Service and Training
Q1. What about the payment way?
A1. By TT, L/C at sight trade assurance. 30% down payment should be paid after contract is valid, 70% balance should be paid before shipment.
Q2. Installation and stuff training available from you?
A2. Yes, we have rich engineers around the world which can send to your factory and train your workers. Also we can online guide your members.
Q3. How long is the guarantee?
A3. We offer you high quality machines with 12 months guarantee and reply you as soon as possible within 6 hours.
Q4. If the machine some parts is broken one day, how can we get help from you?
A4. We will send you spare parts free of charge If they are in warranty, not including easy-broken parts. For easy-broken parts, we will only charge a cost fee.
Q5.How does your factory do regarding quality control?
A5.We have passed the IS09001:2000 Quality Management System and CE certificate and we have a special QC department in charge of products' quality. If you also need other certificates, we also can help to apply.
Q6. What is your packaging?
A6. Our conventional packaging is: After doing the anti-rust treatment, wrap the plastic film around the machine and then fix the machine on the wooden bracket.
Q7. How can we check the machines before delivery?
A7. We can provide online checking when testing the machine on site. We will take and prepare detailed testing videos for your checking before the delivery. We accept third-party testing. Except above points,we will provide detailed testing report.